Leader Forecasting Accuracy
A leader's ability to predict their own organization's measures (e.g., engagement scores, attrition rates, operational outcomes) in advance of actuals. Posited as a measurable, expected, LEARNABLE leadership attribute (Tetlock-adjacent: cf. the judgmental-forecasting / superforecasting literature on forecasting as a trainable skill). Two distinct subcomponents, registered as child constructs: (a) point accuracy — closeness of point estimates to actuals — and (b) calibration — interval honesty, i.e., whether stated uncertainty intervals contain actuals at their nominal rate. Proposed PA-original construct (provenance: pa-original); psychometric properties unestablished.
§1How it’s measured
This is a behavioral construct — an event recorded in HR systems, not a self-report. It is measured as an operational metric with a formula, not a questionnaire; a Likert scale here would be a category error.
mean absolute (or scale-relative) error of point forecasts vs recorded actuals · scoreinterval score (interval width + coverage-miss penalty) + 80/90 interval hit rates vs nominal coverage · score§3The math on what we know
Synthesized priors from the live registry: pooled r, studies (k), total N, top study grade, and heterogeneity. Rows flagged for heterogeneity or single-study evidence are directional, not settled — read them as a central tendency.